capacity

200 MW

Location

USA

capacity

200 MW

Location

USA

Milford

Milford

project info

project info

The Milford project in Utah (along with a 94 mile transmission line to reach the Utah substation) was built to tie into the DC line owned by Southern California Public Power Authority (SCPPA) connecting to Los Angeles

The Milford project in Utah (along with a 94 mile transmission line to reach the Utah substation) was built to tie into the DC line owned by Southern California Public Power Authority (SCPPA) connecting to Los Angeles

UPC negotiated an innovative 20-year prepaid PPA with SCPPA, the first of its kind for wind energy Under the contract, SCPPA prepaid approximately USD270mm, allowing the project to be built without debt

UPC negotiated an innovative 20-year prepaid PPA with SCPPA, the first of its kind for wind energy Under the contract, SCPPA prepaid approximately USD270mm, allowing the project to be built without debt

Specifications

Specifications

Size

Size

200 MW

200 MW

Status

Status

Operational

Operational

Location

Location

USA

USA

COD Date

COD Date

2009

2009

About us

Our businesses

General inquiries

info@upcrenewables.com

Country offices

Singapore (HQ)

Philippines

Indonesia

India

Vietnam

Hong Kong

Laos

Australia

Sri Lanka

Japan

Mongolia

USA

Netherlands

About UPC

Team

Commitment

Contact

Wind & Solar

BioEnergy

UPC Commodities

UPC Capital Ventures