The project is Indonesias first utility scale wind farm and began providing power to the Southern Sulawesi PLN grid in March 2018. The project uses 30 Gamesa 2.5 MW turbines.

The project is Indonesias first utility scale wind farm and began providing power to the Southern Sulawesi PLN grid in March 2018. The project uses 30 Gamesa 2.5 MW turbines.

Sidrap completed construction on the April 5th, 2018 and was inaugurated by the President of Indonesia, Joko Widodo on July 5th, 2018. Notably, Sidrap was completed on time and on budget. The Sidrap project was owned in partnership with AC Energy Holding (an Ayala Corporation subsidiary) with bank finance by the U.S. Overseas Private Investment Corporation (now DFC)

Sidrap completed construction on the April 5th, 2018 and was inaugurated by the President of Indonesia, Joko Widodo on July 5th, 2018. Notably, Sidrap was completed on time and on budget. The Sidrap project was owned in partnership with AC Energy Holding (an Ayala Corporation subsidiary) with bank finance by the U.S. Overseas Private Investment Corporation (now DFC)

Specifications

Specifications

Size

Size

75 MW

75 MW

Status

Status

Operational

Operational

Location

Location

Indonesia

Indonesia

COD Date

COD Date

2018

2018

About us

Our businesses

General inquiries

info@upcrenewables.com

Country offices

Singapore (HQ)

Philippines

Indonesia

India

Vietnam

Hong Kong

Laos

Australia

Sri Lanka

Japan

Mongolia

USA

Netherlands

About UPC

Team

Commitment

Contact

Wind & Solar

BioEnergy

UPC Commodities

UPC Capital Ventures